MY WATCHLIST

  • Die Merkliste ist leer
FavoriteLoadingMerkliste löschen

Your favorite posts saved to your browsers cookies. If you clear cookies also favorite posts will be deleted.

FavoriteLoadingZur Merkliste

1st breakthrough at the Semmering Base Tunnel

A few days ago, the first breakthrough for track 2 of the Semmering base tunnel was celebrated. This connected the construction sections between Göstritz in Lower Austria in the district of Neunkirchen (Lot SBT 1.1) and Fröschnitzgraben in Styria in the district of Bruck-Mürzzuschlag (Lot SBT 2.1). Thus, more than 24 km, i.e. almost 90% of the 27.3 km long twin-tube tunnel have already been excavated.

We are proud to have made a significant contribution to this success under difficult geological conditions as being responsible for the control survey of the entire tunnel structure and for the geotechnical measurements in Lot SBT 2.1.

 

Pictures: OBB, Ebner

Inquiry
Geodata

    First name*

    Last name*

    Email*

    Phone number

    Company

    Subjects

    Your request

    Your contact information will be stored in accordance with the terms of our privacy policy. By submitting this form you agree to this use. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.