MY WATCHLIST

  • Die Merkliste ist leer
FavoriteLoadingMerkliste löschen

FavoriteLoadingZur Merkliste

Rodundwerk I - TBM excavation started

The existing pressure shaft of the Rodundwerk I of the Vorarlberger Illwerke will be completely renewed. The pumped storage power station with a capacity of 198 megawatts in turbine operation and 41 megawatts in pump operation is part of the Upper Ill-Lünersee power station group and supplies valuable peak and control energy. The new pressure shaft is being excavated using a tunnel boring machine. This will work its way from bottom to top and then be extended at the top.

At the end of August, driving of the open hard rock TBM, which is equipped with our control system TAUROS, started.

                 

 

Inquiry
Geodata
First name*

Last name*

Email*

Phone number

Company

Subjects

Your request

Your contact information will be stored in accordance with the terms of our privacy policy. By submitting this form you agree to this use. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.